Case Study: Clements Gap Wind Farm
South Australia
Generating capacity: 56.7 MW
Number of Generators: 27
Customer: Pacific Hydro
Scope: Balance of Plant Maintenance
WORKS
Inspections, tests and maintenance of 132kV plant & equipment
- Power Transformer
- Circuit Breaker
- Current Transformer
- Voltage Transformer
- Isolator
Inspections, tests and maintenance of 33kV plant & equipment
- Circuit Breakers
- 690V/22kV Step-Up Kiosk Transformers (27 in total)
- Ring Main Units
- 22kV Underground
- Reticulation System
Protection & Control System Maintenance
- Injection Tests
- Functionality Tests
- Trip Functions
- Setting Confirmation
- Fault Detection and Rectification
- UPS Maintenance & Repair
- 110V DC Power Supply Maintenance.
HV Operators – Switching of HV Plant
- Provision of Breakdown Response
- HV Cable Jointing and Terminating
- Identification and Repair of Defects on all Systems
Case Study: Cathederal Rocks Wind Farm
South Australia
Generating capacity: 66 MW
Number of Generators: 33
Owner: Energy Australia & Acciona Energy
Scope: Balance of Plant Maintenance
WORKS
Inspections, tests and maintenance of 22kV plant & equipment
- Circuit breakers
- Ring Main Units
- 22kV Reticulation System
Protection & Control System Maintenance
- Injection Tests
- Functionality Tests
- Trip Functions
- Setting Confirmation
- Fault Detection and Rectification
- UPS Maintenance & Repair
- 110V DC Power Supply Maintenance.
- Provision of Breakdown Response
- HV Cable Jointing and Terminating
- Identification and Repair of Defects on all Systems
Case Study: Boco Rock Wind Farm
New South Wales
Generating capacity: 113.90MW
Number of Generators: 67
Customer: Boco Rock Wind Farm Pty Ltd
Scope: Balance of Plant Maintenance, 10 year contract commencing February 2015
WORKS
Inspections, tests and maintenance of 132kV plant & equipment
- Power Transformer
- Circuit Breaker
- Current Transformer
- Voltage Transformer
- Isolator
Inspections, tests and maintenance of 33kV plant & equipment
- 33kV Circuit Breakers
- 690V/33kV Step-Up Kiosk Transformers (67 in total)
- 33kV Underground Reticulation System
- 33kV Overhead Line
Protection & Control System Maintenance
- Injection Tests
- Functionality Tests
- Trip Functions
- Setting Confirmation
- Fault Detection and Rectification
- UPS Maintenance & Repair
- 110V DC Power Supply Maintenance.
- Provision of Breakdown Response
- HV Cable Jointing and Terminating
- Identification and Repair of Defects on all Systems